Soboba Tribal Administration

 

Preliminary geotechnical and environmental/biological studies as required and mandated by the FEIS (Federal Environmental Impact Study) are being conducted by specialty consultants.


These studies are inclusive of the mitigation of endangered species and geotechnical due diligence studies that are required for the design of the facility.


Check back soon for updates on all elements of this project, including design and construction activities.

Pages

Subscribe to RSS - Soboba Tribal Administration